PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Pouring concrete at the 3rd Floor From A-D to 1-4 Facing North (800x600).jpg Staggered wire Mesh at the 3rd Floor. (2) (800x600).jpg Staggered wire Mesh at the 3rd Floor. (3) (800x600).jpg Staggered wire Mesh at the 3rd Floor. (4) (800x600).jpg Staggered wire Mesh at the 3rd Floor. (5) (800x600).jpg Staggered wire Mesh at the 3rd Floor. (6) (800x600).jpg Staggered wire Mesh at the 3rd Floor. (7) (800x600).jpg Staggered wire Mesh at the 3rd Floor. (8) (800x600).jpg Welded Skylight steel beam Facing East (800x600).jpg
Previous pageNext page Staggered wire Mesh at the 3rd Floor. (5) (800x600)
Staggered wire Mesh at the 3rd Floor. (5) (800x600)